четверг, 14 марта 2013 г.

Electrice
Electrical cable 3x1.5 mm, 1kv
Electrical cable 3x2.5 mm, 1kv
Electrical cable 5x4 mm, 1kv
Flexibile pipe for protection 25 mm diam
Flexibile pipe for protection 20 mm diam
Power sockets 220V, 16A, wall mounted Legrand or similar 
SP&N supply, 32 A, commando outlet
Light switch, Legrand Mosaic or similar, 10 A
Light fixture 4x18W, matching existing, Philips or similar
Downlight 2x26W,opal, Philips or similar
Electrical connection boxes 100 x 100 mm
Electrical connection boxes 70 mm diam 
Plastic box to protect the endings of the cables
Bachmann PDU (extension leed) equipped with 1  electrical sockets and safety power indicator, cord length 3 metersand 1 data ports
Floor box 16 modules equipped with 4 electrical outlets and 8 data RJ45 modules, recessed mounted in concrete,Legrand Mosaic or similar 
Aluminium column 2.7 m Legrand fully equiped
Cable management PVC crossing plinth
Circuit brakers 10A/16A/32A
Connectors with 5 pins 
Metallic trays -  100x50 (including montage kit)
Metallic trays -  200x50 (including montage kit)
Metallic trays -  300x50 (including montage kit)
Auxilliary materials (connectors, end dry heads, tape, tags etc)
Earth connection to server room
Reconfigure existing light fixtures
Modify switching and electrical circuits to suit new partitioning 
Dismantle - reassemble electrical distribution pannels acc. To MEP design
Running tests for electrical system 
 
Mecanice
Cable Csyy-F 9x1mm
Insulated flexibile duct Dn 200 
Insulated flexibile duct Dn 250
Metallic ducting for inlet/exhaust air, different sections, connection pieces included
Inlet grille with ALP plenum, 600 x 600
Outlet grille EggCrate, 600 x 600
Pipework - hot and chilled water supply for fan coil, kitchen sink, waste, gravity condensate connection, sprinklers piping, taps etc
Encased sewage pump
Rauhis pipe including fittings with  20 x 2,3 mm
Ball valve FI-FE, Pn 10,  1/2”
Electric water heater 10 l 
Auxiliary materials
Ventilation works acc to the list of materials
Modifications to HVAC System to suit new layout
Sanitary works
Running tests